Floor Pan Installation Guide

Last updated: January 31, 2026

Tools

  • 3/16 allen key
  • 1/2 wrench or socket

Hardware Required

  • 5/16-18 x 3/4" Button Head Bolt (6 for Gas, 8 for Electric)
  • 5/16-18 Nylock Nut (6 for Gas, 8 for Electric)

Installation Steps

  1. Install Side Pods into their spots
  2. Secure with hardware
Add an installation image

Additional Information

Questions? Call us

480-955-KART ext. 0